Production entry - Actual use tab
Enter the actual use of the goods against the production schedule.
→To Operation Procedure
Screen Transition
[Production Control Module]
↓
[Entry]
↓
[Production Entry]
↓
[Production entry] screen - [Actual
production] tab
[Production entry] screen - [Actual use] tab
Item setup
[Header (main item)]
-
Entry Date
-
Schedule
-
Internal No.
-
Production No.
-
Production Schedule No.
Enter a number when entering the production (actual production) against the production schedule.
-
Manufacturing No.
-
Department
-
Evidence No.
-
File Name
[Header (sub item)]
-
Flexible Master 1 - 3
-
Flexible Date 1, 2
-
Flexible Amt 1, 2
-
Post pad
[Detail (main item)]
-
Goods Code
-
Unit/Packing Entry
Select either "Unit" or "Packing Entry." When "Packing Entry" has been selected, select a packing unit with the pull-down menu.
-
Unit Qty (displayed only when "Packing Entry" has been selected)
-
Structure Qty
Enter the structure quantity.
When "Packing Entry" has been selected, the result of "Unit Qty × Structure Qty" is automatically entered.
-
Unit Qty (displayed only when "Packing Entry" has been selected)
-
Structure Qty (displayed only when "Packing Entry" has been selected)
-
Unit Price (Std)
-
Actual Unit Price
-
Amt
The result of "Actual Unit Price × Structure Qty" is automatically entered.
-
Manufacturing No.
-
Analysis code 1, 2
[Detail (sub item)]
-
Flexible Master 1 - 3
-
Flexible Date 1, 2
-
Flexible Amt 1, 2
-
Flexible Qty 1, 2
[Spread]
The information on the detail selected in the [Header] is listed.
[Buttons]