Back  Top

Production Qty entry

The Execution year total production sum is displayed based on the previous year production sum in [Production Qty entry].
Layers whose "Depreciation calculation" is "Production proportion method" can only be entered on the [Detail1] tab of the [Fixed Assets] screen.
→ To Operation Procedure

Screen Transition

[Fixed Assets Module]
  ↓
[Entry]
  ↓
[Register fixed assets]
  ↓
[Register fixed assets] screen - Header tab
[Register fixed assets] screen - Detail tab (Depreciation layer)
 [Register fixed assets] screen - Detail1 tab
    "Production Qty" button → [Production Qty entry] screen
 [Register fixed assets] screen - Detail2 tab
    "Production Qty" button → [Production Qty entry] screen

Item Setup

[Production Quantity List]

After clicking on the "Refer" button, enter "Estimated total production Qty(A) " and "Production Qty" by term.

[Buttons]

 

Back  Top

Copyright © 2019 Business Engineering Corp.